Data center in Leon Valley
Data center in Leon Valley is an operational data center in Leon Valley, United States. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 14 MW (range 7.1 MW to 23 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,881 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 29.45223, -98.71406 |
Power and grid
| Nearest high-voltage substation | Anderson Substation, 138 kV, 3.5 km away (CPS Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Cagnon Road Substation, 345 kV, 4 km away |
| HV substations within 10 km | 17 |
| Utility | City Of San Antonio (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | El Paso Texas Pipeline Co, intrastate pipeline, 2.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.2 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.5 °C (2001 to 2025) |
| Cooling degree days | 1,804 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.84 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Leon Valley use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How close is Data center in Leon Valley to the power grid?
The nearest high-voltage substation in OpenStreetMap is Anderson Substation (138 kV), about 3.5 km away. The local utility is City Of San Antonio, in the ERCO balancing area.
How clean is the power for Data center in Leon Valley?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Data centers near Leon Valley
- Data center in Leon Valley 285 m · 14 MW
- Microsoft 2.5 km · 74 MW
- CyrusOne San Antonio 3.0 km · 4.7 MW
- Frost Bank data center in Leon Valley 3.2 km · 11 MW
- Vantage San Antonio II 3.3 km · 18 MW
- Lowe's Data Center 3.3 km · 11 MW
- CHRISTUS Health data center in Leon Valley 3.4 km · 8.9 MW
- Microsoft 3.6 km · 26 MW