Digital Realty IAD44
Digital Realty IAD44 is an operational data center operated by Digital Realty in Sterling, United States. Its power is about 104 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Realty |
| Facility power | 104 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 80 MW |
| GPU capacity if all AI | about 44,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Digital Realty IAD45 |
| Address | Efficiency Drive 43704, 20166, Sterling |
| Coordinates | 38.96086, -77.49143 |
| Website | digitalrealty.com/data-centers/americas/northern-virginia/iad44 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 500 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 51 |
| Utility | Northern Virginia Elec Coop (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Dominion Transmission Co, interstate pipeline, 2.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 39 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Digital Realty IAD44 use?
Public data puts the facility power at about 104 MW. Derived from a tagged IT power value.
How close is Digital Realty IAD44 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 500 m away. The local utility is Northern Virginia Elec Coop, in the PJM balancing area.
How clean is the power for Digital Realty IAD44?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Digital Realty IAD44?
Digital Realty.
Data centers near Sterling
- Digital Realty data center in Sterling 259 m · 42 MW
- Amazon Web Services data center in South Riding 684 m · 21 MW
- CyrusOne NVA9 992 m · 15 MW
- CyrusOne Sterling NVA9 1.3 km · 49 MW
- Amazon IAD-180 2.3 km · 24 MW
- Amazon Fadeley III 3.0 km · 22 MW
- Google Data Center 3.6 km · 45 MW
- Tech Park at Brambleton 3.6 km · 27 MW
More Digital Realty data centers
- Digital Realty CH1 - Chicago United States
- Digital Realty IAD39 United States
- Digital Realty IAD51 United States
- Digital Realty IAD41 United States
- Digital Realty Singapore SIN11 Singapore
- Digital Realty Toronto YYZ11 Canada
- Digital Realty IAD43 United States
- Digital Realty IAD42 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.