Data Center Directory

CyrusOne NVA9

CyrusOne NVA9 is an operational data center operated by CyrusOne in South Riding, United States. Our footprint estimate of its power is about 15 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power15 MW (range 7.5 MW to 24 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 12,569 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressOld Ox Road 43304
Coordinates38.95885, -77.50261

Power and grid

Nearest high-voltage substationCabin Run Substation, 230 kV, 500 m away (Virginia Electric & Power Company)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km50
UtilityNorthern Virginia Elec Coop (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineDominion Transmission Co, interstate pipeline, 1.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.6 GW in 31 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CyrusOne NVA9 use?

We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.

How close is CyrusOne NVA9 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Cabin Run Substation (230 kV), about 500 m away. The local utility is Northern Virginia Elec Coop, in the PJM balancing area.

How clean is the power for CyrusOne NVA9?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates CyrusOne NVA9?

CyrusOne.