CyrusOne NVA5 is an operational data center operated by CyrusOne in Sterling, United States. Its power is about 137 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 137 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 105 MW |
| GPU capacity if all AI | about 58,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Pacific Boulevard 21350, 20166, Sterling |
| Opened | 2019 |
| Coordinates | 39.02436, -77.43410 |
| Website | cyrusone.com/data-centers/north-america/sterling-va-nva5-nva7 |
Power and grid
| Nearest high-voltage substation | Beco Substation, 230 kV, 300 m away (Dominion Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 40 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 4.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne NVA5 use?
Public data puts the facility power at about 137 MW. Derived from a tagged IT power value.
How close is CyrusOne NVA5 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Beco Substation (230 kV), about 300 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for CyrusOne NVA5?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates CyrusOne NVA5?
CyrusOne.
Data centers near Sterling
- Amazon IAD-10 314 m · 12 MW
- CyrusOne Sterling V 350 m · 10 MW
- Amazon IAD-99 577 m · 18 MW
- Amazon IAD-174 764 m · 28 MW
- Amazon IAD-119 944 m · 28 MW
- Amazon IAD-163 962 m · 18 MW
- Amazon IAD-116 1.2 km · 11 MW
- Equinix DC12 1.4 km · 24 MW
More CyrusOne data centers
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
- CyrusOne NJ-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.