CyrusOne NJ-1

CyrusOne NJ-1 is an operational data center operated by CyrusOne in Somerset, United States. Our footprint estimate of its power is about 40 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power40 MW (range 20 MW to 64 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 33,409 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 17,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks3 networks
PeeringDB.
Address800 Cottontail Lane
Coordinates40.53822, -74.54602
Websitecyrusone.com/locations/new-jersey/somerset-i

Power and grid

Nearest high-voltage substationPolhemus/Bridgewater Substation, 230 kV, 2.9 km away (PSE&G)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km7
UtilityPublic Service Elec & Gas Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTexas Eastern Trans Co, interstate pipeline, 700 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km12 GW in 182 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity265 g CO₂ per kWh (New Jersey, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8%
Industrial power priceUSD 0.162 per kWh (New Jersey, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days565 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.92 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayMedium - High (20-40%) (New Jersey)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CyrusOne NJ-1 use?

We estimate the facility power at about 40 MW. Estimate from building footprint, low confidence.

How close is CyrusOne NJ-1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Polhemus/Bridgewater Substation (230 kV), about 2.9 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.

How clean is the power for CyrusOne NJ-1?

The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.

Who operates CyrusOne NJ-1?

CyrusOne.