Data Center Directory

Rackspace Belmont NYC2

Rackspace Belmont NYC2 is an operational data center in Bound Brook, United States. Our footprint estimate of its power is about 7.6 MW.

Key facts

StatusOperational
Facility power7.6 MW (range 3.8 MW to 12 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,333 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.54084, -74.53749

Power and grid

Nearest high-voltage substationPolhemus/Bridgewater Substation, 230 kV, 3.1 km away (PSE&G)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km8
UtilityPublic Service Elec & Gas Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTexas Eastern Trans Co, interstate pipeline, 100 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km12 GW in 182 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity265 g CO₂ per kWh (New Jersey, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8%
Industrial power priceUSD 0.162 per kWh (New Jersey, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days565 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.92 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayMedium - High (20-40%) (New Jersey)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Rackspace Belmont NYC2 use?

We estimate the facility power at about 7.6 MW. Estimate from building footprint, low confidence.

How close is Rackspace Belmont NYC2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Polhemus/Bridgewater Substation (230 kV), about 3.1 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.

How clean is the power for Rackspace Belmont NYC2?

The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.

Data centers near Bound Brook

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.