Data center in Somerset
Data center in Somerset is an operational data center in Somerset, United States. Our footprint estimate of its power is about 32 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 32 MW (range 16 MW to 51 MW) Estimate from building footprint, low confidence. Footprint estimate: about 26,520 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Howard Avenue 665, 08873, Somerset |
| Coordinates | 40.53987, -74.54217 |
Power and grid
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Texas Eastern Trans Co, interstate pipeline, 400 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 565 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Somerset use?
We estimate the facility power at about 32 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Somerset?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Data centers near Somerset
- CyrusOne NJ-1 373 m · 40 MW
- Rackspace Belmont NYC2 410 m · 7.6 MW
- Data center in Bound Brook 501 m · 3.3 MW
- BNY Mellon Somerset 1.1 km · 13 MW
- Digital Realty data center in Manville 1.2 km · 11 MW
- Data center in Manville 1.8 km · 3.3 MW
- Digital Fortress (PNJ) 3.9 km · 18 MW
- Equinix 4.0 km · 10 MW