BNY Mellon Somerset
BNY Mellon Somerset is an operational data center in Manville, United States. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 13 MW (range 6.4 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,690 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.53587, -74.55343 |
Power and grid
| Nearest high-voltage substation | Polhemus/Bridgewater Substation, 230 kV, 2.9 km away (PSE&G) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Texas Eastern Trans Co, interstate pipeline, 1.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 12 GW in 181 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 565 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does BNY Mellon Somerset use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How close is BNY Mellon Somerset to the power grid?
The nearest high-voltage substation in OpenStreetMap is Polhemus/Bridgewater Substation (230 kV), about 2.9 km away. The local utility is Public Service Elec & Gas Co, in the PJM balancing area.
How clean is the power for BNY Mellon Somerset?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Data centers near Manville
- Digital Realty data center in Manville 255 m · 11 MW
- CyrusOne NJ-1 679 m · 40 MW
- Data center in Somerset 1.1 km · 32 MW
- Data center in Manville 1.4 km · 3.3 MW
- Rackspace Belmont NYC2 1.5 km · 7.6 MW
- Data center in Bound Brook 1.5 km · 3.3 MW
- Digital Fortress (PNJ) 4.9 km · 18 MW
- Equinix 5.0 km · 10 MW
Sources
Correct this page or get the data