Data center in Bound Brook
Data center in Bound Brook is an operational data center in Bound Brook, United States. Our footprint estimate of its power is about 3.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.3 MW (range 1.3 MW to 8.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 27,802 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Rackspace Somerset NYC1 |
| Coordinates | 40.54333, -74.53837 |
Power and grid
| Utility | Public Service Elec & Gas Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Texas Eastern Trans Co, interstate pipeline, 100 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 565 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Bound Brook use?
We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Bound Brook?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Data centers near Bound Brook
- Rackspace Belmont NYC2 287 m · 7.6 MW
- Data center in Somerset 501 m · 32 MW
- CyrusOne NJ-1 860 m · 40 MW
- BNY Mellon Somerset 1.5 km · 13 MW
- Digital Realty data center in Manville 1.6 km · 11 MW
- Data center in Manville 2.3 km · 3.3 MW
- Digital Fortress (PNJ) 3.5 km · 18 MW
- Equinix 3.6 km · 10 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.