Data center in Bound Brook is an operational data center in Bound Brook, United States. Our footprint estimate of its power is about 3.3 MW.

Key facts

StatusOperational
Facility power3.3 MW (range 1.3 MW to 8.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 27,802 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asRackspace Somerset NYC1
Coordinates40.54333, -74.53837

Power and grid

UtilityPublic Service Elec & Gas Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTexas Eastern Trans Co, interstate pipeline, 100 m away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity265 g CO₂ per kWh (New Jersey, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8%
Industrial power priceUSD 0.162 per kWh (New Jersey, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days565 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.92 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayMedium - High (20-40%) (New Jersey)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Bound Brook use?

We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Bound Brook?

The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.