CyrusOne FRA3 is an operational data center operated by CyrusOne in Frankfurt am Main, Germany. Our footprint estimate of its power is about 67 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 67 MW (range 33 MW to 107 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,922 m² building outline x 4 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 29,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Wilhelm-Fay-Straße 45, 65936, Frankfurt am Main |
| Coordinates | 50.12884, 8.57707 |
Power and grid
| Nearest high-voltage substation | Westerbach, 110 kV, 800 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Frankfurt Südwest, 380 kV, 5 km away |
| HV substations within 10 km | 35 |
| Power plants within 50 km | 3.3 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.8 °C (2001 to 2025) |
| Cooling degree days | 233 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne FRA3 use?
We estimate the facility power at about 67 MW. Estimate from building footprint, low confidence.
How close is CyrusOne FRA3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Westerbach (110 kV), about 800 m away.
How clean is the power for CyrusOne FRA3?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates CyrusOne FRA3?
CyrusOne.
Data centers near Frankfurt am Main
- CyrusOne Frankfurt 4 313 m · 6.3 MW
- MK Netzdienste Datacenter 409 m · 1.2 MW
- CyrusOne Frankfurt 1 431 m · 5.9 MW
- Digital Realty Frankfurt FRA29-32 633 m · 3.3 MW
- Colt FRA3 889 m · 5.8 MW
- Global Switch Frankfurt 1.5 km · 2.6 MW
- NTT Frankfurt 1 Data Center (FRA1) 1.7 km · 10 MW
- NTT Global Data Centers data center in Frankfurt am Main 2.0 km · 2.1 MW
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
- CyrusOne NJ-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.