Equinix AT2/AT3 - Atlanta
Equinix AT2/AT3 - Atlanta is an operational data center operated by Equinix in Atlanta, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 191 networks, 4 internet exchanges PeeringDB. |
| Also known as | Digital Realty ATL13 - Atlanta · Atlanta ATL13 |
| Address | 56 Marietta St NW |
| Coordinates | 33.75546, -84.39153 |
| Website | equinix.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 1.1 km away (Georgia Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 1.5 km away |
| HV substations within 10 km | 43 |
| Utility | Georgia Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Southern Natural Gas Co, interstate pipeline, 6.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.9 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 1,020 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix AT2/AT3 - Atlanta to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1.1 km away. The local utility is Georgia Power Co, in the SOCO balancing area.
How clean is the power for Equinix AT2/AT3 - Atlanta?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates Equinix AT2/AT3 - Atlanta?
Equinix.
Data centers near Atlanta
- Colo at 55, LLC 58 m
- Colo@34 (Downtown) 183 m
- Equinix AT1 - Atlanta 484 m
- Digital Realty ATL14 - Atlanta 685 m
- Southern Telecom 809 m
- Level(3) Atlanta (Courtland) 1.3 km · 2 MW
- Databank Atlanta (ATL1) 2.3 km
- Google Fiber 2.9 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.