Level(3) Atlanta (Courtland)
Level(3) Atlanta (Courtland) is an operational data center operated by Lumen Technologies in Atlanta, United States. Our footprint estimate of its power is about 2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Facility power | 2 MW (range 1 MW to 3.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,697 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 850 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Also known as | H5 Data Centers Atlanta · CenturyLink |
| Address | 345 Courtland St Ne |
| Coordinates | 33.76514, -84.38373 |
| Website | level3.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 900 m away (Georgia Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Wabash, 230 kV, 1.1 km away |
| HV substations within 10 km | 45 |
| Utility | Georgia Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SOCO |
| Nearest gas pipeline | Southern Natural Gas Co, interstate pipeline, 7.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.9 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 352 g CO₂ per kWh (Georgia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6% |
| Industrial power price | USD 0.131 per kWh (Georgia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 16.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 1,020 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.43 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Georgia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Level(3) Atlanta (Courtland) use?
We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.
How close is Level(3) Atlanta (Courtland) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 900 m away. The local utility is Georgia Power Co, in the SOCO balancing area.
How clean is the power for Level(3) Atlanta (Courtland)?
The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.
Who operates Level(3) Atlanta (Courtland)?
Lumen Technologies.
Data centers near Atlanta
- Southern Telecom 510 m
- Digital Realty ATL14 - Atlanta 803 m
- Equinix AT1 - Atlanta 825 m
- Databank Atlanta (ATL1) 1.2 km
- Colo at 55, LLC 1.2 km
- Colo@34 (Downtown) 1.3 km
- Equinix AT2/AT3 - Atlanta 1.3 km
- Google Fiber 1.7 km
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Seattle (Denny Way) United States
- Level(3) Denver United States
- Level(3) London (Braham Street) United Kingdom
- Level(3) McLean United States
- Lumen Ashburn United States
- Level(3) Sunnyvale United States
- Level(3) Dallas United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.