Data Center Directory

Level(3) Atlanta (Courtland)

Level(3) Atlanta (Courtland) is an operational data center operated by Lumen Technologies in Atlanta, United States. Our footprint estimate of its power is about 2 MW.

Key facts

StatusOperational
OperatorLumen Technologies
Facility power2 MW (range 1 MW to 3.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,697 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 850 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks5 networks, 1 internet exchanges
PeeringDB.
Also known asH5 Data Centers Atlanta · CenturyLink
Address345 Courtland St Ne
Coordinates33.76514, -84.38373
Websitelevel3.com

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 900 m away (Georgia Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWabash, 230 kV, 1.1 km away
HV substations within 10 km45
UtilityGeorgia Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authoritySOCO
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 7.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.9 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity352 g CO₂ per kWh (Georgia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 38.7%, nuclear 34.8%, coal 13.6%, solar 8.1%, bioenergy 3.2%. Clean power: 47.6%
Industrial power priceUSD 0.131 per kWh (Georgia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature16.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.1 °C (2001 to 2025)
Cooling degree days1,020 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.43 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayMedium - High (20-40%) (Georgia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Level(3) Atlanta (Courtland) use?

We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.

How close is Level(3) Atlanta (Courtland) to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 900 m away. The local utility is Georgia Power Co, in the SOCO balancing area.

How clean is the power for Level(3) Atlanta (Courtland)?

The grid in Georgia emits about 352 g CO₂ per kWh (2025). Largest sources: gas 38.7%, nuclear 34.8%, coal 13.6%.

Who operates Level(3) Atlanta (Courtland)?

Lumen Technologies.

Data centers near Atlanta

More Lumen Technologies data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.