Level(3) Seattle (Denny Way)
Level(3) Seattle (Denny Way) is an operational data center operated by Lumen Technologies in Seattle, United States. Our footprint estimate of its power is about 30 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Facility power | 30 MW (range 15 MW to 48 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,135 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 10 networks, 2 internet exchanges PeeringDB. |
| Also known as | H5 Data Centers Seattle · The Seattle Times |
| Address | 1000 Denny Way |
| Opened | 1929 |
| Coordinates | 47.61905, -122.33639 |
| Website | level3.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 700 m away (Seattle City Light) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 2.5 km away |
| HV substations within 10 km | 8 |
| Utility | City Of Seattle (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SCL |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 20.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 126 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.42 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Level(3) Seattle (Denny Way) use?
We estimate the facility power at about 30 MW. Estimate from building footprint, low confidence.
How close is Level(3) Seattle (Denny Way) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 700 m away. The local utility is City Of Seattle, in the SCL balancing area.
How clean is the power for Level(3) Seattle (Denny Way)?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates Level(3) Seattle (Denny Way)?
Lumen Technologies.
Data centers near Seattle
- Digital Realty Seattle SEA10 556 m · 13 MW
- Equinix SE3 Data Center 573 m · 11 MW
- SBTC 816 m
- KOMO Plaza Seattle (Formerly Fisher Plaza) 891 m · 38 MW
- Digital Fortress (SEA) 1.5 km · 13 MW
- Comcast data center in Greenwood 8.4 km · 0.7 MW
- EdgeConneX Seattle (EDCSEA01) 13.9 km
- DataBank Seattle (SEA2) 14.2 km · 9.3 MW
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Denver United States
- Level(3) London (Braham Street) United Kingdom
- Level(3) McLean United States
- Lumen Ashburn United States
- Level(3) Sunnyvale United States
- Level(3) Dallas United States
- Lumen Norristown United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.