Level(3) Seattle (Denny Way)

Level(3) Seattle (Denny Way) is an operational data center operated by Lumen Technologies in Seattle, United States. Our footprint estimate of its power is about 30 MW.

Key facts

StatusOperational
OperatorLumen Technologies
Facility power30 MW (range 15 MW to 48 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,135 m² building outline x 6 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 13,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks10 networks, 2 internet exchanges
PeeringDB.
Also known asH5 Data Centers Seattle · The Seattle Times
Address1000 Denny Way
Opened1929
Coordinates47.61905, -122.33639
Websitelevel3.com

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 700 m away (Seattle City Light)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 2.5 km away
HV substations within 10 km8
UtilityCity Of Seattle (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authoritySCL
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 20.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km126 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity135 g CO₂ per kWh (Washington, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9%
Industrial power priceUSD 0.074 per kWh (Washington, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days79 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.42 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayLow - Medium (10-20%) (Washington)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Level(3) Seattle (Denny Way) use?

We estimate the facility power at about 30 MW. Estimate from building footprint, low confidence.

How close is Level(3) Seattle (Denny Way) to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 700 m away. The local utility is City Of Seattle, in the SCL balancing area.

How clean is the power for Level(3) Seattle (Denny Way)?

The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.

Who operates Level(3) Seattle (Denny Way)?

Lumen Technologies.

Data centers near Seattle

More Lumen Technologies data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.