EdgeConneX Seattle (EDCSEA01)
EdgeConneX Seattle (EDCSEA01) is an operational data center operated by EdgeConneX in Tukwila, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Networks | 8 networks PeeringDB. |
| Address | 3425 S 116th St |
| Coordinates | 47.49821, -122.28996 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Creston-Nelson Substation, 230 kV, 2 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Utility | City Of Seattle (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SCL |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 7.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 622 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.42 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is EdgeConneX Seattle (EDCSEA01) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Creston-Nelson Substation (230 kV), about 2 km away. The local utility is City Of Seattle, in the SCL balancing area.
How clean is the power for EdgeConneX Seattle (EDCSEA01)?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates EdgeConneX Seattle (EDCSEA01)?
EdgeConneX.
Data centers near Tukwila
- DataBank Seattle (SEA2) 357 m · 9.3 MW
- Intergate Seattle East Building 3 527 m · 25 MW
- Intergate Seattle East Building 4 541 m · 12 MW
- Intergate West / Digital.forest / Fortress 563 m · 3.8 MW
- WowRack 632 m · 3.4 MW
- Centersquare Seattle (SEA1-B) 704 m · 20 MW
- Centersquare Seattle (SEA1-A) 716 m · 6.1 MW
- Equinix SE4 - Seattle, Kent 9.2 km
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States