Data Center Directory

Intergate West / Digital.forest / Fortress

Intergate West / Digital.forest / Fortress is an operational data center operated by Sabey Data Centers in Tukwila, United States. Our footprint estimate of its power is about 3.8 MW.

Key facts

StatusOperational
OperatorSabey Data Centers
Facility power3.8 MW (range 1.9 MW to 6.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,166 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks13 networks, 3 internet exchanges
PeeringDB.
Also known asDigital Fortress (TUK) · Sabey Intergate East Building 4 · Intergate Seattle West Building C
Address12101 Tukwila International Blvd.
Coordinates47.49414, -122.29441
Websitesabey.com/datacenters

Power and grid

Nearest high-voltage substationDuwamish Substation, 230 kV, 2.5 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km6
UtilityCity Of Seattle (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authoritySCL
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 7.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km622 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity135 g CO₂ per kWh (Washington, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9%
Industrial power priceUSD 0.074 per kWh (Washington, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days79 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.42 kWh per m² per day
Wind at 50 m3.5 m/s average
Water stress todayLow - Medium (10-20%) (Washington)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Intergate West / Digital.forest / Fortress use?

We estimate the facility power at about 3.8 MW. Estimate from building footprint, low confidence.

How close is Intergate West / Digital.forest / Fortress to the power grid?

The nearest high-voltage substation in OpenStreetMap is Duwamish Substation (230 kV), about 2.5 km away. The local utility is City Of Seattle, in the SCL balancing area.

How clean is the power for Intergate West / Digital.forest / Fortress?

The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.

Who operates Intergate West / Digital.forest / Fortress?

Sabey Data Centers.

Data centers near Tukwila

More Sabey Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.