Intergate Columbia
Intergate Columbia is an operational data center operated by Sabey Data Centers in East Wenatchee Bench, United States. Our footprint estimate of its power is about 31 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Sabey Data Centers |
| Facility power | 31 MW (range 12 MW to 77 MW) Estimate from building footprint, low confidence. Footprint estimate: about 256,303 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Intergate Columbia A · Intergate Columbia D |
| Coordinates | 47.40801, -120.19180 |
Power and grid
| Nearest high-voltage substation | Veedol Substation, 115 kV, 800 m away (Douglas County PUD) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Jumpoff Ridge, 230 kV, 6 km away |
| HV substations within 10 km | 2 |
| Utility | PUD No 1 Of Douglas County (political subdivision) Electric retail service territory (HIFLD, US government). |
| Balancing authority | DOPD |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 2.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.0 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 235 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.11 kWh per m² per day |
| Wind at 50 m | 4.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Intergate Columbia use?
We estimate the facility power at about 31 MW. Estimate from building footprint, low confidence.
How close is Intergate Columbia to the power grid?
The nearest high-voltage substation in OpenStreetMap is Veedol Substation (115 kV), about 800 m away. The local utility is PUD No 1 Of Douglas County, in the DOPD balancing area.
How clean is the power for Intergate Columbia?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates Intergate Columbia?
Sabey Data Centers.
Data centers near East Wenatchee Bench
- Intergate Columbia B 335 m · 17 MW
- Microsoft EAT02 1.5 km · 22 MW
- Actapio 1.7 km · 6.9 MW
- Microsoft EAT04 2.1 km · 21 MW
- Data center in East Wenatchee 2.6 km · 1.2 MW
- Data center in Quincy 29.3 km · 19 MW
- Microsoft 29.6 km · 13 MW
- Azure OpenAI GPT-3 Cluster 29.9 km · 6.6 MW
More Sabey Data Centers data centers
- Intergate.Quincy United States
- Sabey Intergate.Ashburn United States
- Intergate Seattle East Building 3 United States
- Data Center Germany
- Intergate Columbia B United States
- Intergate West / Digital.forest / Fortress United States
- 375 Pearl, Intergate.Manhattan United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.