Microsoft EAT02
Microsoft EAT02 is an operational data center operated by Microsoft in East Wenatchee Bench, United States. Our footprint estimate of its power is about 22 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 22 MW (range 11 MW to 35 MW) Estimate from building footprint, low confidence. Footprint estimate: about 18,032 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 9,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Microsoft EAT03 |
| Coordinates | 47.41687, -120.20769 |
Power and grid
| Nearest high-voltage substation | Veedol Substation, 115 kV, 800 m away (Douglas County PUD) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Jumpoff Ridge, 230 kV, 7.5 km away |
| HV substations within 10 km | 2 |
| Utility | PUD No 1 Of Douglas County (political subdivision) Electric retail service territory (HIFLD, US government). |
| Balancing authority | DOPD |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.0 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.8 °C (2001 to 2025) |
| Cooling degree days | 235 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.11 kWh per m² per day |
| Wind at 50 m | 4.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft EAT02 use?
We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.
What chips does Microsoft EAT02 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft EAT02 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Veedol Substation (115 kV), about 800 m away. The local utility is PUD No 1 Of Douglas County, in the DOPD balancing area.
How clean is the power for Microsoft EAT02?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates Microsoft EAT02?
Microsoft.
Data centers near East Wenatchee Bench
- Microsoft EAT04 554 m · 21 MW
- Actapio 1.1 km · 6.9 MW
- Intergate Columbia 1.5 km · 31 MW
- Intergate Columbia B 1.9 km · 17 MW
- Data center in East Wenatchee 2.8 km · 1.2 MW
- Data center in Quincy 30.9 km · 19 MW
- Microsoft 31.2 km · 13 MW
- Azure OpenAI GPT-3 Cluster 31.4 km · 6.6 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.