Intergate Columbia B

Intergate Columbia B is an operational data center operated by Sabey Data Centers in East Wenatchee, United States. Our footprint estimate of its power is about 17 MW.

Key facts

StatusOperational
OperatorSabey Data Centers
Facility power17 MW (range 8.7 MW to 28 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 14,462 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressGrant Road 4405 B, 98802, East Wenatchee
Coordinates47.40716, -120.18752

Power and grid

Nearest high-voltage substationVeedol Substation, 115 kV, 1.1 km away (Douglas County PUD)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationJumpoff Ridge, 230 kV, 5.8 km away
HV substations within 10 km2
UtilityPUD No 1 Of Douglas County (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authorityDOPD
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 2.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.0 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity135 g CO₂ per kWh (Washington, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9%
Industrial power priceUSD 0.074 per kWh (Washington, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature8.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.8 °C (2001 to 2025)
Cooling degree days235 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.11 kWh per m² per day
Wind at 50 m4.1 m/s average
Water stress todayLow - Medium (10-20%) (Washington)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Intergate Columbia B use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

How close is Intergate Columbia B to the power grid?

The nearest high-voltage substation in OpenStreetMap is Veedol Substation (115 kV), about 1.1 km away. The local utility is PUD No 1 Of Douglas County, in the DOPD balancing area.

How clean is the power for Intergate Columbia B?

The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.

Who operates Intergate Columbia B?

Sabey Data Centers.

Data centers near East Wenatchee

More Sabey Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.