Intergate Seattle East Building 4
Intergate Seattle East Building 4 is an operational data center operated by Digital Realty in Tukwila, United States. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Realty |
| Facility power | 12 MW (range 6.1 MW to 20 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,168 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | South 120th Place 3433, 98168, Tukwila |
| Coordinates | 47.49340, -122.28888 |
Power and grid
| Nearest high-voltage substation | Creston-Nelson Substation, 230 kV, 2.2 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Utility | City Of Seattle (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SCL |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 7.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 622 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.42 kWh per m² per day |
| Wind at 50 m | 3.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Intergate Seattle East Building 4 use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How close is Intergate Seattle East Building 4 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Creston-Nelson Substation (230 kV), about 2.2 km away. The local utility is City Of Seattle, in the SCL balancing area.
How clean is the power for Intergate Seattle East Building 4?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates Intergate Seattle East Building 4?
Digital Realty.
Data centers near Tukwila
- Intergate Seattle East Building 3 119 m · 25 MW
- Centersquare Seattle (SEA1-B) 182 m · 20 MW
- DataBank Seattle (SEA2) 221 m · 9.3 MW
- Centersquare Seattle (SEA1-A) 362 m · 6.1 MW
- WowRack 364 m · 3.4 MW
- Intergate West / Digital.forest / Fortress 423 m · 3.8 MW
- EdgeConneX Seattle (EDCSEA01) 541 m
- Equinix SE4 - Seattle, Kent 8.7 km
More Digital Realty data centers
- Digital Realty CH1 - Chicago United States
- Digital Realty IAD39 United States
- Digital Realty IAD51 United States
- Digital Realty IAD44 United States
- Digital Realty IAD41 United States
- Digital Realty Singapore SIN11 Singapore
- Digital Realty Toronto YYZ11 Canada
- Digital Realty IAD43 United States
Sources
Correct this page or get the data