Data Center Directory

Level(3) McLean

Level(3) McLean is an operational data center operated by Lumen Technologies in McLean, United States. Our footprint estimate of its power is about 9.7 MW.

Key facts

StatusOperational
OperatorLumen Technologies
Facility power9.7 MW (range 4.8 MW to 16 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,042 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks9 networks
PeeringDB.
Also known asLumen McLean 1 · Lumen McLean
Address1755 Old Meadow Rd
Coordinates38.92006, -77.21213
Websitelumen.com

Satellite view

Questions

How much power does Level(3) McLean use?

We estimate the facility power at about 9.7 MW. Estimate from building footprint, low confidence.

Who operates Level(3) McLean?

Lumen Technologies.

Data centers near McLean

More Lumen Technologies data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.