DataBank McLean (IAD2)
DataBank McLean (IAD2) is an operational data center operated by DataBank in McLean, United States. Our footprint estimate of its power is about 5.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DataBank |
| Facility power | 5.5 MW (range 2.7 MW to 8.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,281 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks, 1 internet exchanges PeeringDB. |
| Also known as | DataBank IAD2 |
| Address | 1674A Old Meadow Lane |
| Coordinates | 38.91978, -77.21564 |
| Website | databank.com/data-centers/northern-va/nv2 |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 11.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.2 °C (2001 to 2025) |
| Cooling degree days | 748 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.04 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DataBank McLean (IAD2) use?
We estimate the facility power at about 5.5 MW. Estimate from building footprint, low confidence.
How clean is the power for DataBank McLean (IAD2)?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates DataBank McLean (IAD2)?
DataBank.
Data centers near McLean
- Level(3) McLean 305 m · 9.7 MW
- Gosnell - International Gateway 1 (8100 Boone) 1.1 km · 13 MW
- Element Critical Northern Virginia VA1 1.3 km · 9.5 MW
- Equinix DC7 - Ashburn, Vienna 1.3 km
- Equinix DC8 - Ashburn, Vienna 2.4 km
- Digital Realty IAD (1780 Business Center) 10.2 km · 17 MW
- Evocative Virginia (VA1) 10.4 km · 3.3 MW
- Flex Data Center 11.9 km
More DataBank data centers
- Databank Orangeburg (LGA3) United States
- DataBank Salt Lake City (SLC2) United States
- DataBank Ashburn (IAD1) United States
- DataBank Dallas (DFW3) United States
- DataBank Las Vegas (LAS1) United States
- DataBank Dallas (DFW4) United States
- DataBank Minneapolis (MSP3) United States
- DataBank Seattle (SEA2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.