Data Center Directory

Equinix DC7 - Ashburn, Vienna

Equinix DC7 - Ashburn, Vienna is an operational data center operated by Equinix in Vienna, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorEquinix
Networks8 networks, 2 internet exchanges
PeeringDB.
Address7990 Science Applications Ct
Coordinates38.90842, -77.21969
Websiteequinix.com

Power and grid

Nearest high-voltage substationIdylwood Substation, 230 kV, 2.7 km away (Dominion Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km11
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 11.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.2 GW in 62 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature13.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.2 °C (2001 to 2025)
Cooling degree days748 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.04 kWh per m² per day
Wind at 50 m5.9 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is Equinix DC7 - Ashburn, Vienna to the power grid?

The nearest high-voltage substation in OpenStreetMap is Idylwood Substation (230 kV), about 2.7 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for Equinix DC7 - Ashburn, Vienna?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates Equinix DC7 - Ashburn, Vienna?

Equinix.

Data centers near Vienna

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.