Equinix CH1/CH2/CH4 - Chicago

Equinix CH1/CH2/CH4 - Chicago is an operational data center operated by Equinix in Chicago, United States. Our footprint estimate of its power is about 78 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power78 MW (range 39 MW to 124 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,798 m² building outline x 6 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 33,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks337 networks, 10 internet exchanges
PeeringDB.
Also known asDigital Realty CHI (350 E Cermak) · CME Cermak · Centersquare Chicago (ORD1) · CDC1 - 350 E Cermak Rd · Lakeside Technology Center · Digital Realty ORD10
Address350 E Cermak Rd
Coordinates41.85365, -87.61834
Websiteequinix.com

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 1.3 km away (Commonwealth Edison)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationComEd Taylor 138kV-345kV Substation, 345 kV, 2.4 km away
HV substations within 10 km32
UtilityCommonwealth Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineNatural Gas PL Co of Am, interstate pipeline, 9.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.4 GW in 34 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity247 g CO₂ per kWh (Illinois, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3%
Industrial power priceUSD 0.113 per kWh (Illinois, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.7 °C (2001 to 2025)
Cooling degree days362 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m7.3 m/s average
Water stress todayMedium - High (20-40%) (Illinois)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix CH1/CH2/CH4 - Chicago use?

We estimate the facility power at about 78 MW. Estimate from building footprint, low confidence.

How close is Equinix CH1/CH2/CH4 - Chicago to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 1.3 km away. The local utility is Commonwealth Edison Co, in the PJM balancing area.

How clean is the power for Equinix CH1/CH2/CH4 - Chicago?

The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.

Who operates Equinix CH1/CH2/CH4 - Chicago?

Equinix.