Serverfarm CH1 Chicago
Serverfarm CH1 Chicago is an operational data center operated by Serverfarm in Chicago, United States. Our footprint estimate of its power is about 29 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Serverfarm |
| Facility power | 29 MW (range 15 MW to 47 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,093 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks, 2 internet exchanges PeeringDB. |
| Also known as | DataBank Chicago (ORD2) · Serverfarm CH1 |
| Address | 840 S. Canal Street |
| Coordinates | 41.87091, -87.64015 |
| Website | serverfarmllc.com/data-centers/chicago-data-center |
Power and grid
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Natural Gas PL Co of Am, interstate pipeline, 8.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.7 °C (2001 to 2025) |
| Cooling degree days | 362 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 7.3 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Serverfarm CH1 Chicago use?
We estimate the facility power at about 29 MW. Estimate from building footprint, low confidence.
How clean is the power for Serverfarm CH1 Chicago?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates Serverfarm CH1 Chicago?
Serverfarm.
Data centers near Chicago
- TierPoint Chicago - Polk 235 m
- Netrality Chicago - 717 S Wells 612 m
- Printer's Square Chicago (600 S Federal) 927 m · 0.9 MW
- 365 Data Centers Chicago (CH6) 931 m
- CoreSite - Chicago (CH2) 931 m · 5.4 MW
- Cogent Chicago 1 961 m
- Level(3) Chicago (Canal) 1.1 km
- West Monroe 1.1 km
More Serverfarm data centers
- Serverfarm LAX1 Los Angeles United States
- Serverfarm LON1 – London Data Center United Kingdom
- ServerFarm SC1 United States
- Serverfarm AMS1 Amsterdam Netherlands
- Serverfarm ATL1 Atlanta United States
- Serverfarm CH2 Oak Brook / Chicago United States
- Serverfarm TiTAN Moses Lake United States
- Serverfarm TOR1 Toronto Canada
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.