Level(3) Chicago (Canal)
Level(3) Chicago (Canal) is an operational data center operated by Lumen Technologies in Chicago, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Networks | 3 networks PeeringDB. |
| Address | 111 Canal, Suite 200 |
| Coordinates | 41.88044, -87.63961 |
| Website | level3.com |
Power and grid
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Natural Gas PL Co of Am, interstate pipeline, 8.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.7 °C (2001 to 2025) |
| Cooling degree days | 362 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 7.3 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Level(3) Chicago (Canal)?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates Level(3) Chicago (Canal)?
Lumen Technologies.
Data centers near Chicago
- West Monroe 304 m
- Cogent Chicago 1 475 m
- Hut 8 H100 Cluster 623 m · 1.4 MW
- 365 Data Centers Chicago (CH6) 823 m
- Cogent Chicago 2 914 m
- Netrality Chicago - 717 S Wells 988 m
- TierPoint Chicago - Polk 1.0 km
- Printer's Square Chicago (600 S Federal) 1.1 km · 0.9 MW
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Seattle (Denny Way) United States
- Level(3) Denver United States
- Level(3) London (Braham Street) United Kingdom
- Level(3) McLean United States
- Lumen Ashburn United States
- Level(3) Sunnyvale United States
- Level(3) Dallas United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.