Level(3) London (Braham Street) is an operational data center operated by Lumen Technologies in London, United Kingdom. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Facility power | 12 MW (range 5.8 MW to 19 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,621 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 6 networks PeeringDB. |
| Also known as | Stellanor London East |
| Address | 6 Braham St |
| Coordinates | 51.51391, -0.07250 |
| Website | level3.com |
Power and grid
| Nearest high-voltage substation | Mansell Street BSP, 132 kV, 100 m away (London Underground) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | City Road Substation, 400 kV, 2.4 km away |
| HV substations within 10 km | 58 |
| Power plants within 50 km | 3.0 GW in 96 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34 °C (2001 to 2025) |
| Cooling degree days | 46 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Level(3) London (Braham Street) use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How close is Level(3) London (Braham Street) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Mansell Street BSP (132 kV), about 100 m away.
How clean is the power for Level(3) London (Braham Street)?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Level(3) London (Braham Street)?
Lumen Technologies.
Data centers near London
- Sky 398 m · 12 MW
- Digital Realty London LON1-3 726 m · 4.7 MW
- Templus DC London LON02 1.2 km
- Redcentric London Data Centre 1.2 km · 1.9 MW
- colt data center in Islington 1.2 km · 1.7 MW
- Epsilon Global Hubs London 1.5 km
- Digital Realty London LHR18 1.5 km
- Netwise London Central (NLC) 1.8 km
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Seattle (Denny Way) United States
- Level(3) Denver United States
- Level(3) McLean United States
- Lumen Ashburn United States
- Level(3) Sunnyvale United States
- Level(3) Dallas United States
- Lumen Norristown United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.