Level(3) Sunnyvale is an operational data center operated by Lumen Technologies in Sunnyvale, United States. Our footprint estimate of its power is about 7.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Facility power | 7.2 MW (range 3.6 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,020 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 8 networks, 2 internet exchanges PeeringDB. |
| Also known as | Lumen Sunnyvale 1 |
| Address | 1380 Kifer Rd. |
| Coordinates | 37.37341, -121.98778 |
| Website | level3.com |
Power and grid
| Utility | City Of Santa Clara (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | CISO |
| Nearest gas pipeline | California Gas Transmission Co, intrastate pipeline, 1.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 370 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.32 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Level(3) Sunnyvale use?
We estimate the facility power at about 7.2 MW. Estimate from building footprint, low confidence.
How clean is the power for Level(3) Sunnyvale?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Who operates Level(3) Sunnyvale?
Lumen Technologies.
Data centers near Sunnyvale
- H5 Data Centers Silicon Valley 154 m
- Centersquare Silicon Valley (SFO3) 212 m · 8.1 MW
- Equinix SV17 - Silicon Valley, Santa Clara 334 m · 3.9 MW
- Data center in Santa Clara 1.2 km · 18 MW
- Digital Realty SJC (2820 NW Pkwy) 1.3 km · 12 MW
- Vantage data center in Santa Clara 1.3 km · 9.8 MW
- CoreSite - Santa Clara (SV7) 1.3 km · 5.3 MW
- CoreSite - Santa Clara (SV8) 1.5 km · 3.9 MW
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Seattle (Denny Way) United States
- Level(3) Denver United States
- Level(3) London (Braham Street) United Kingdom
- Level(3) McLean United States
- Lumen Ashburn United States
- Level(3) Dallas United States
- Lumen Norristown United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.