Lumen Ashburn
Lumen Ashburn is an operational data center operated by Lumen Technologies in Ashburn, United States. Our footprint estimate of its power is about 9.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Facility power | 9.2 MW (range 4.6 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,655 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Guilford Drive 44633, 20147, Ashburn |
| Coordinates | 39.02218, -77.45761 |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 3.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Lumen Ashburn use?
We estimate the facility power at about 9.2 MW. Estimate from building footprint, low confidence.
How clean is the power for Lumen Ashburn?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Lumen Ashburn?
Lumen Technologies.
Data centers near Ashburn
- RagingWire VA1 - NTT 228 m · 16 MW
- Digital Realty IAD (44490 Chilum) 239 m · 18 MW
- RagingWire VA2 - NTT 301 m · 18 MW
- Equinix DC3 301 m · 7 MW
- Cologix ASH1 339 m · 156 MW
- Centersquare Northern Virginia (IAD4) 375 m · 24 MW
- Equinix DC16 512 m · 67 MW
- Digital Realty IAD (44521 Hastings) 535 m · 44 MW
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Seattle (Denny Way) United States
- Level(3) Denver United States
- Level(3) London (Braham Street) United Kingdom
- Level(3) McLean United States
- Level(3) Sunnyvale United States
- Level(3) Dallas United States
- Lumen Norristown United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.