Centersquare Northern Virginia (IAD4)
Centersquare Northern Virginia (IAD4) is an operational data center operated by Centersquare in Ashburn, United States. Our footprint estimate of its power is about 24 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Centersquare |
| Facility power | 24 MW (range 12 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,115 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 10,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 11 networks, 1 internet exchanges PeeringDB. |
| Also known as | Centersquare IAD4-B · Centersquare IAD4-A |
| Address | 21571 Beaumeade Circle, Bldg. A |
| Coordinates | 39.02194, -77.45328 |
| Website | centersquaredc.com/data-centers/northern-virginia |
Power and grid
| Nearest high-voltage substation | Interconnection Substation, 230 kV, 400 m away (Dominion Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 49 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 3.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centersquare Northern Virginia (IAD4) use?
We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.
How close is Centersquare Northern Virginia (IAD4) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Interconnection Substation (230 kV), about 400 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Centersquare Northern Virginia (IAD4)?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Centersquare Northern Virginia (IAD4)?
Centersquare.
Data centers near Ashburn
- RagingWire VA1 - NTT 164 m · 16 MW
- Equinix DC10 187 m · 27 MW
- Equinix DC16 266 m · 67 MW
- Equinix DC12 325 m · 24 MW
- CyrusOne NVA14 357 m · 47 MW
- Lumen Ashburn 375 m · 9.2 MW
- RagingWire VA2 - NTT 494 m · 18 MW
- Cologix ASH1 495 m · 156 MW
More Centersquare data centers
- Centersquare Dallas (DFW1) United States
- Centersquare Chicago (ORD2) United States
- Centersquare Atlanta (ATL1-A/B/C) United States
- Centersquare Chicago (ORD4) United States
- Centersquare New Jersey (EWR5) United States
- Centersquare Northern Virginia (IAD1-C/E) United States
- Centersquare Seattle (SEA1-B) United States
- Centersquare Dallas (DFW2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.