Centersquare Dallas (DFW2)
Centersquare Dallas (DFW2) is an operational data center operated by Centersquare in Allen, United States. Our footprint estimate of its power is about 19 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Centersquare |
| Facility power | 19 MW (range 9.4 MW to 30 MW) Estimate from building footprint, low confidence. Footprint estimate: about 15,607 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 8,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks, 1 internet exchanges PeeringDB. |
| Also known as | Evoque Allen DA1 |
| Address | 900 Guardians Way |
| Coordinates | 33.09489, -96.68326 |
| Website | centersquaredc.com/data-centers/dallas-fortworth |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 500 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Allen Switching Station, 345 kV, 4.2 km away |
| HV substations within 10 km | 17 |
| Utility | Grayson-Collin Elec Coop, INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | Energy Transfer, intrastate pipeline, 6.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.4 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.7 °C (2001 to 2025) |
| Cooling degree days | 1,494 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.64 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centersquare Dallas (DFW2) use?
We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.
How close is Centersquare Dallas (DFW2) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 500 m away. The local utility is Grayson-Collin Elec Coop, INC, in the ERCO balancing area.
How clean is the power for Centersquare Dallas (DFW2)?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Centersquare Dallas (DFW2)?
Centersquare.
Data centers near Allen
- Data center in Allen 203 m · 13 MW
- Cisco Allen 5.0 km · 15 MW
- TierPoint Dallas2 - Allen 5.3 km · 2.6 MW
- CyrusOne Allen Campus 5.4 km · 16 MW
- ScaleMatrix data center in Allen 5.4 km · 2.2 MW
- ScaleMatrix Dallas Data Center US-South 01 5.4 km
- GIP Plano 9.2 km
- Experian McKinney Data Center 9.4 km · 13 MW
More Centersquare data centers
- Centersquare Dallas (DFW1) United States
- Centersquare Chicago (ORD2) United States
- Centersquare Atlanta (ATL1-A/B/C) United States
- Centersquare Chicago (ORD4) United States
- Centersquare Northern Virginia (IAD4) United States
- Centersquare New Jersey (EWR5) United States
- Centersquare Northern Virginia (IAD1-C/E) United States
- Centersquare Seattle (SEA1-B) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.