Experian McKinney Data Center

Experian McKinney Data Center is an operational data center in Allen, United States. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
Facility power13 MW (range 6.4 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,633 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSouth Stonebridge Drive 3400
Coordinates33.17180, -96.72550

Power and grid

Nearest high-voltage substationCuster Substation, 138 kV, 2.8 km away (Brazos Electric)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationCollin Substation, 345 kV, 8.6 km away
HV substations within 10 km15
UtilityGrayson-Collin Elec Coop, INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineEnergy Transfer, intrastate pipeline, 1.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.8 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature18.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.7 °C (2001 to 2025)
Cooling degree days1,494 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.64 kWh per m² per day
Wind at 50 m6.5 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Experian McKinney Data Center use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is Experian McKinney Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is Custer Substation (138 kV), about 2.8 km away. The local utility is Grayson-Collin Elec Coop, INC, in the ERCO balancing area.

How clean is the power for Experian McKinney Data Center?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Data centers near Allen

Sources

Correct this page or get the data