Data Center Directory

TierPoint Dallas2 - Allen

TierPoint Dallas2 - Allen is an operational data center operated by TierPoint in Allen, United States. Our footprint estimate of its power is about 2.6 MW.

Key facts

StatusOperational
OperatorTierPoint
Facility power2.6 MW (range 1 MW to 6.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 21,665 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks6 networks, 1 internet exchanges
PeeringDB.
Also known asCyrusOne Dallas (Allen)
Address820 Allen Commerce Parkway
Coordinates33.13752, -96.65791
Websitetierpoint.com/data-centers/texas/dallas-allen

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 500 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationAllen Switching Station, 345 kV, 9.5 km away
HV substations within 10 km11
UtilityGrayson-Collin Elec Coop, INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineEnergy Transfer, intrastate pipeline, 1.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.5 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature18.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.7 °C (2001 to 2025)
Cooling degree days1,494 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.64 kWh per m² per day
Wind at 50 m6.5 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does TierPoint Dallas2 - Allen use?

We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.

How close is TierPoint Dallas2 - Allen to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 500 m away. The local utility is Grayson-Collin Elec Coop, INC, in the ERCO balancing area.

How clean is the power for TierPoint Dallas2 - Allen?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates TierPoint Dallas2 - Allen?

TierPoint.

Data centers near Allen

More TierPoint data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.