TierPoint Sioux Falls - West is an operational data center operated by TierPoint in Sioux Falls, United States. Our footprint estimate of its power is about 5.3 MW.

Key facts

StatusOperational
OperatorTierPoint
Facility power5.3 MW (range 2.6 MW to 8.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,404 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asTierPoint Sioux Falls West Data Center
Address5300 North La Mesa Drive
Coordinates43.60606, -96.81021
Websitetierpoint.com

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 3.2 km away (Xcel Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 13 km away
HV substations within 10 km5
UtilitySioux Valley Sw Elec Coop (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authoritySWPP
Nearest gas pipelineNorthern Natural Gas Co, interstate pipeline, 4.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km386 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity145 g CO₂ per kWh (South Dakota, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 58%, hydro 22.3%, coal 9.3%, gas 8.5%, solar 2%. Clean power: 82.3%
Industrial power priceUSD 0.094 per kWh (South Dakota, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature8.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43.4 °C (2001 to 2025)
Cooling degree days505 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.11 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (South Dakota)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does TierPoint Sioux Falls - West use?

We estimate the facility power at about 5.3 MW. Estimate from building footprint, low confidence.

How close is TierPoint Sioux Falls - West to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 3.2 km away. The local utility is Sioux Valley Sw Elec Coop, in the SWPP balancing area.

How clean is the power for TierPoint Sioux Falls - West?

The grid in South Dakota emits about 145 g CO₂ per kWh (2025). Largest sources: wind 58%, hydro 22.3%, coal 9.3%.

Who operates TierPoint Sioux Falls - West?

TierPoint.

Data centers near Sioux Falls

More TierPoint data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.