TierPoint Nashville
TierPoint Nashville is an operational data center operated by TierPoint in Franklin, United States. Our footprint estimate of its power is about 3.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TierPoint |
| Facility power | 3.4 MW (range 1.3 MW to 8.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 28,118 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks PeeringDB. |
| Also known as | TierPoint |
| Address | 311 Eddy Lane |
| Coordinates | 35.92457, -86.85582 |
| Website | tierpoint.com/data-centers/tennessee/nashville |
Power and grid
| Nearest high-voltage substation | Franklin Substation, 161 kV, 200 m away (Tennessee Valley Authority) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Davidson Substation, 500 kV, 19.7 km away |
| HV substations within 10 km | 10 |
| Utility | Middle Tennessee E M C (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TVA |
| Nearest gas pipeline | Columbia Gulf Pipeline, interstate pipeline, 200 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 145 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.7 °C (2001 to 2025) |
| Cooling degree days | 923 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.23 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TierPoint Nashville use?
We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.
How close is TierPoint Nashville to the power grid?
The nearest high-voltage substation in OpenStreetMap is Franklin Substation (161 kV), about 200 m away. The local utility is Middle Tennessee E M C, in the TVA balancing area.
How clean is the power for TierPoint Nashville?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Who operates TierPoint Nashville?
TierPoint.
Data centers near Franklin
- Flexential - Nashville/Cool Springs (NAS02/03) 3.6 km · 17 MW
- Flexential - Nashville/Franklin (NAS05/06) 3.7 km · 8.5 MW
- Flexential - Nashville/Brentwood (NAS01/04) 6.8 km · 11 MW
- Data center in Brentwood Estates 12.4 km · 25 MW
- Level(3) Nashville (Sidco Drive) 21.8 km
- HCA Information Technology & Services Data Center 23.0 km · 6.6 MW
- Data center in Nashville 25.4 km · 1.2 MW
- Peace Communications NSH2 26.0 km
More TierPoint data centers
- TierPoint St. Louis - Olive United States
- TierPoint Boston - Andover United States
- TierPoint Kansas City - Lenexa United States
- TierPoint Sioux Falls - West United States
- TIerPoint Little Rock United States
- TierPoint Baltimore United States
- TierPoint Tulsa-Archer United States
- TierPoint Dallas2 - Allen United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.