Data center in Nashville is an operational data center in Nashville, United States. Our footprint estimate of its power is about 1.2 MW.

Key facts

StatusOperational
Facility power1.2 MW (range 0.6 MW to 1.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 996 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 510 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates36.14050, -86.76414

Power and grid

Nearest high-voltage substationCraighead Substation, 161 kV, 1.2 km away (Nashville Electric Service)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationPin Hook Substation, 500 kV, 17.7 km away
HV substations within 10 km7
UtilityNashville Electric Service (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityTVA
Nearest gas pipelineGulf Xpress, interstate pipeline, 12.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.1 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity363 g CO₂ per kWh (Tennessee, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2%
Industrial power priceUSD 0.069 per kWh (Tennessee, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.7 °C (2001 to 2025)
Cooling degree days923 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.23 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayLow - Medium (10-20%) (Tennessee)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Nashville use?

We estimate the facility power at about 1.2 MW. Estimate from building footprint, low confidence.

How close is Data center in Nashville to the power grid?

The nearest high-voltage substation in OpenStreetMap is Craighead Substation (161 kV), about 1.2 km away. The local utility is Nashville Electric Service, in the TVA balancing area.

How clean is the power for Data center in Nashville?

The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.