Tennessee Processing Center LLC
Tennessee Processing Center LLC is an operational data center operated by BNYM in Nashville, United States. Our footprint estimate of its power is about 8.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | BNYM |
| Facility power | 8.6 MW (range 3.4 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 71,390 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 3,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 36.21564, -86.78400 |
Power and grid
| Nearest high-voltage substation | Trinity Hills Substation, 161 kV, 600 m away (Nashville Electric Service) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Davidson Substation, 500 kV, 24.4 km away |
| HV substations within 10 km | 8 |
| Utility | Nashville Electric Service (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TVA |
| Nearest gas pipeline | Tennessee Gas Pipeline, interstate pipeline, 11.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.1 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.7 °C (2001 to 2025) |
| Cooling degree days | 923 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.23 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Tennessee Processing Center LLC use?
We estimate the facility power at about 8.6 MW. Estimate from building footprint, low confidence.
How close is Tennessee Processing Center LLC to the power grid?
The nearest high-voltage substation in OpenStreetMap is Trinity Hills Substation (161 kV), about 600 m away. The local utility is Nashville Electric Service, in the TVA balancing area.
How clean is the power for Tennessee Processing Center LLC?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Who operates Tennessee Processing Center LLC?
BNYM.
Data centers near Nashville
- Level(3) Nashville (9th Ave) 3.5 km
- H5 Data Centers Nashville 5.9 km
- IRIS - Nashville 5.9 km
- XO Nashville 6.4 km
- Zayo Nashville - 209 10th Ave. S 6.7 km
- Verizon Wireless 7.5 km · 2.8 MW
- Data center in Nashville 8.5 km · 1.2 MW
- EdgeConneX Nashville (EDCNAS01) 10.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.