Verizon Wireless
Verizon Wireless is an operational data center in Goodlettsville, United States. Our footprint estimate of its power is about 2.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.8 MW (range 1.1 MW to 6.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,993 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 36.28218, -86.79714 |
Power and grid
| Nearest high-voltage substation | Whites Creek Substation, 161 kV, 5.1 km away (Nashville Electric Service) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Davidson Substation, 500 kV, 29.2 km away |
| HV substations within 10 km | 5 |
| Utility | Nashville Electric Service (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TVA |
| Nearest gas pipeline | Tennessee Gas Pipeline, interstate pipeline, 5.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.1 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 880 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.23 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Verizon Wireless use?
We estimate the facility power at about 2.8 MW. Estimate from building footprint, low confidence.
How close is Verizon Wireless to the power grid?
The nearest high-voltage substation in OpenStreetMap is Whites Creek Substation (161 kV), about 5.1 km away. The local utility is Nashville Electric Service, in the TVA balancing area.
How clean is the power for Verizon Wireless?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Data centers near Goodlettsville
- Tennessee Processing Center LLC 7.5 km · 8.6 MW
- Level(3) Nashville (9th Ave) 10.4 km
- H5 Data Centers Nashville 13.4 km
- IRIS - Nashville 13.4 km
- XO Nashville 13.9 km
- Zayo Nashville - 209 10th Ave. S 14.2 km
- Data center in Nashville 16.0 km · 1.2 MW
- EdgeConneX Nashville (EDCNAS01) 17.5 km