Flexential - Nashville/Franklin (NAS05/06) is an operational data center operated by Flexential in Franklin, United States. Our footprint estimate of its power is about 8.5 MW.

Key facts

StatusOperational
OperatorFlexential
Facility power8.5 MW (range 4.3 MW to 14 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 7,103 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asFlexential Nashville - Franklin
Address4600 Carothers Parkway
Coordinates35.92028, -86.81562
Websiteflexential.com

Power and grid

Nearest high-voltage substationEast Franklin Substation, 161 kV, 300 m away (Middle Tennesse Electric)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationRutherford Substation, 500 kV, 22.1 km away
HV substations within 10 km9
UtilityMiddle Tennessee E M C (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityTVA
Nearest gas pipelineColumbia Gulf Pipeline, interstate pipeline, 2.5 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km183 MW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity363 g CO₂ per kWh (Tennessee, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2%
Industrial power priceUSD 0.069 per kWh (Tennessee, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.7 °C (2001 to 2025)
Cooling degree days923 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.23 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayLow - Medium (10-20%) (Tennessee)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Flexential - Nashville/Franklin (NAS05/06) use?

We estimate the facility power at about 8.5 MW. Estimate from building footprint, low confidence.

How close is Flexential - Nashville/Franklin (NAS05/06) to the power grid?

The nearest high-voltage substation in OpenStreetMap is East Franklin Substation (161 kV), about 300 m away. The local utility is Middle Tennessee E M C, in the TVA balancing area.

How clean is the power for Flexential - Nashville/Franklin (NAS05/06)?

The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.

Who operates Flexential - Nashville/Franklin (NAS05/06)?

Flexential.

Data centers near Franklin

More Flexential data centers

Sources

Correct this page or get the data