Flexential - Nashville/Cool Springs (NAS02/03) is an operational data center operated by Flexential in Franklin, United States. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Flexential |
| Facility power | 17 MW (range 8.7 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,465 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks PeeringDB. |
| Also known as | Flexential Nashville - Cool Springs |
| Address | 425 Duke Drive, Suite 400 |
| Coordinates | 35.95109, -86.83325 |
| Website | flexential.com |
Power and grid
| Nearest high-voltage substation | Aspen Grove Substation, 161 kV, 1.2 km away (Middle Tennesse Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Davidson Substation, 500 kV, 18.8 km away |
| HV substations within 10 km | 10 |
| Utility | Middle Tennessee E M C (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TVA |
| Nearest gas pipeline | Gulf Xpress, interstate pipeline, 300 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 145 MW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.7 °C (2001 to 2025) |
| Cooling degree days | 923 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.23 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Flexential - Nashville/Cool Springs (NAS02/03) use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
How close is Flexential - Nashville/Cool Springs (NAS02/03) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Aspen Grove Substation (161 kV), about 1.2 km away. The local utility is Middle Tennessee E M C, in the TVA balancing area.
How clean is the power for Flexential - Nashville/Cool Springs (NAS02/03)?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Who operates Flexential - Nashville/Cool Springs (NAS02/03)?
Flexential.
Data centers near Franklin
- Flexential - Nashville/Brentwood (NAS01/04) 3.2 km · 11 MW
- TierPoint Nashville 3.6 km · 3.4 MW
- Flexential - Nashville/Franklin (NAS05/06) 3.8 km · 8.5 MW
- Data center in Brentwood Estates 8.9 km · 25 MW
- Level(3) Nashville (Sidco Drive) 18.2 km
- HCA Information Technology & Services Data Center 19.8 km · 6.6 MW
- Data center in Nashville 22.0 km · 1.2 MW
- Peace Communications NSH2 22.5 km
More Flexential data centers
- Douglasville 2 United States
- Flexential - Atlanta/Douglasville (ATL5) United States
- Flexential - Portland/Hillsboro 3 (PDX03) United States
- Flexential - Dallas/Plano (DFW01) United States
- Flexential - Denver/Englewood (DEN11) United States
- Flexential - Portland/Hillsboro 2 (PDX02) United States
- Flexential Dallas - Richardson United States
- Flexential - Portland/Hillsboro 4 (PDX04) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.