HCA Information Technology & Services Data Center
HCA Information Technology & Services Data Center is an operational data center in La Vergne, United States. Our footprint estimate of its power is about 6.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.6 MW (range 2.6 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 54,693 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 36.03264, -86.63772 |
Power and grid
| Nearest high-voltage substation | HCA IT & Services Data Center, 161 kV, 100 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Pin Hook Substation, 500 kV, 3.3 km away |
| HV substations within 10 km | 8 |
| Utility | Nashville Electric Service (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TVA |
| Nearest gas pipeline | Columbia Gulf Pipeline, interstate pipeline, 3.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.1 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 363 g CO₂ per kWh (Tennessee, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2% |
| Industrial power price | USD 0.069 per kWh (Tennessee, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 14.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.5 °C (2001 to 2025) |
| Cooling degree days | 897 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.23 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Tennessee) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does HCA Information Technology & Services Data Center use?
We estimate the facility power at about 6.6 MW. Estimate from building footprint, low confidence.
How close is HCA Information Technology & Services Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is HCA IT & Services Data Center (161 kV), about 100 m away. The local utility is Nashville Electric Service, in the TVA balancing area.
How clean is the power for HCA Information Technology & Services Data Center?
The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.
Data centers near La Vergne
- Peace Communications NSH2 8.3 km
- Level(3) Nashville (Sidco Drive) 13.2 km
- Tennessee South Data Center 13.5 km · 2.9 MW
- EdgeConneX Nashville (EDCNAS01) 13.7 km
- Data center in Brentwood Estates 13.9 km · 25 MW
- Data center in Nashville 16.5 km · 1.2 MW
- Flexential - Nashville/Brentwood (NAS01/04) 16.8 km · 11 MW
- XO Nashville 18.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.