Tennessee South Data Center

Tennessee South Data Center is an operational data center operated by State of Tennessee in Smyrna, United States. Our footprint estimate of its power is about 2.9 MW.

Key facts

StatusOperational
OperatorState of Tennessee
Facility power2.9 MW (range 1.2 MW to 7.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 24,496 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates35.99343, -86.49583

Power and grid

Nearest high-voltage substationSmyrna Airport Substation, 161 kV, 700 m away (Middle Tennessee Electric)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationPin Hook Substation, 500 kV, 11.5 km away
HV substations within 10 km8
UtilityMiddle Tennessee E M C (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityTVA
Nearest gas pipelineTexas Eastern Trans Co, interstate pipeline, 4.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.1 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity363 g CO₂ per kWh (Tennessee, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39.2%, coal 24.1%, gas 23.5%, hydro 10.5%, solar 1.9%. Clean power: 52.2%
Industrial power priceUSD 0.069 per kWh (Tennessee, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature14.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.5 °C (2001 to 2025)
Cooling degree days897 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.23 kWh per m² per day
Wind at 50 m5.1 m/s average
Water stress todayLow - Medium (10-20%) (Tennessee)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Tennessee South Data Center use?

We estimate the facility power at about 2.9 MW. Estimate from building footprint, low confidence.

How close is Tennessee South Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is Smyrna Airport Substation (161 kV), about 700 m away. The local utility is Middle Tennessee E M C, in the TVA balancing area.

How clean is the power for Tennessee South Data Center?

The grid in Tennessee emits about 363 g CO₂ per kWh (2025). Largest sources: nuclear 39.2%, coal 24.1%, gas 23.5%.

Who operates Tennessee South Data Center?

State of Tennessee.