TierPoint St. Louis - Olive is an operational data center operated by TierPoint in St. Louis, United States. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TierPoint |
| Facility power | 13 MW (range 6.6 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,765 m² building outline x 4 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | TierPoint |
| Address | 1111 Olive Street |
| Coordinates | 38.62976, -90.19640 |
| Website | tierpoint.com |
Power and grid
| Nearest high-voltage substation | Poplar Substation, 138 kV, 700 m away (Ameren Missouri) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Cahokia Substation, 345 kV, 3.6 km away |
| HV substations within 10 km | 14 |
| Utility | City Of Kirkwood (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Mississippi River Trans Corp, interstate pipeline, 4.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.9 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 674 g CO₂ per kWh (Missouri, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 63.1%, gas 13%, nuclear 9.8%, wind 8.9%, solar 3.3%. Clean power: 23.7% |
| Industrial power price | USD 0.099 per kWh (Missouri, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.6 °C (2001 to 2025) |
| Cooling degree days | 803 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.18 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Missouri) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TierPoint St. Louis - Olive use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How close is TierPoint St. Louis - Olive to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poplar Substation (138 kV), about 700 m away. The local utility is City Of Kirkwood, in the MISO balancing area.
How clean is the power for TierPoint St. Louis - Olive?
The grid in Missouri emits about 674 g CO₂ per kWh (2025). Largest sources: coal 63.1%, gas 13%, nuclear 9.8%.
Who operates TierPoint St. Louis - Olive?
TierPoint.
Data centers near St. Louis
- Netrality St. Louis - 210 N Tucker 92 m · 19 MW
- 710 Tucker St Louis 334 m
- Netrality St. Louis - 900 Walnut 480 m
- TierPoint St. Louis - Locust 1.5 km
- Cogent St Louis 1.7 km
- Genome Data Center 5.2 km · 3.7 MW
- TierPoint St. Louis – Millpark 20.2 km
- Data center in Edwardsville 29.4 km
More TierPoint data centers
- TierPoint Boston - Andover United States
- TierPoint Kansas City - Lenexa United States
- TierPoint Sioux Falls - West United States
- TIerPoint Little Rock United States
- TierPoint Baltimore United States
- TierPoint Nashville United States
- TierPoint Tulsa-Archer United States
- TierPoint Dallas2 - Allen United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.