710 Tucker St Louis
710 Tucker St Louis is an operational data center operated by Hostirian in St. Louis, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Hostirian |
| Networks | 4 networks, 1 internet exchanges PeeringDB. |
| Also known as | H5 Data Centers St. Louis (MO01) |
| Address | 710 North Tucker |
| Coordinates | 38.63273, -90.19581 |
| Website | hostirian.com |
Power and grid
| Nearest high-voltage substation | North Broadway Substation, 138 kV, 1 km away (Ameren Missouri) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Gateway Substation, 345 kV, 3.4 km away |
| HV substations within 10 km | 14 |
| Utility | City Of Kirkwood (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Mississippi River Trans Corp, interstate pipeline, 4.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.9 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 674 g CO₂ per kWh (Missouri, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 63.1%, gas 13%, nuclear 9.8%, wind 8.9%, solar 3.3%. Clean power: 23.7% |
| Industrial power price | USD 0.099 per kWh (Missouri, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.6 °C (2001 to 2025) |
| Cooling degree days | 803 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.18 kWh per m² per day |
| Wind at 50 m | 5.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Missouri) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is 710 Tucker St Louis to the power grid?
The nearest high-voltage substation in OpenStreetMap is North Broadway Substation (138 kV), about 1 km away. The local utility is City Of Kirkwood, in the MISO balancing area.
How clean is the power for 710 Tucker St Louis?
The grid in Missouri emits about 674 g CO₂ per kWh (2025). Largest sources: coal 63.1%, gas 13%, nuclear 9.8%.
Who operates 710 Tucker St Louis?
Hostirian.
Data centers near St. Louis
- TierPoint St. Louis - Olive 334 m · 13 MW
- Netrality St. Louis - 210 N Tucker 399 m · 19 MW
- Netrality St. Louis - 900 Walnut 801 m
- TierPoint St. Louis - Locust 1.5 km
- Cogent St Louis 1.9 km
- Genome Data Center 5.2 km · 3.7 MW
- TierPoint St. Louis – Millpark 20.1 km
- Data center in Edwardsville 29.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.