Genome Data Center
Genome Data Center is an operational data center operated by Washington University in St. Louis in Saint Louis, United States. Our footprint estimate of its power is about 3.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Washington University in St. Louis |
| Facility power | 3.7 MW (range 1.8 MW to 5.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,083 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | South Newstead Avenue 222, 63110, Saint Louis |
| Coordinates | 38.63655, -90.25544 |
Power and grid
| Nearest high-voltage substation | Missouri Central Substation, 138 kV, 1.7 km away (Ameren Missouri) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Cambell Substation, 345 kV, 7.4 km away |
| HV substations within 10 km | 17 |
| Utility | City Of Kirkwood (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Mississippi River Trans Corp, interstate pipeline, 1.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.9 GW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 674 g CO₂ per kWh (Missouri, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 63.1%, gas 13%, nuclear 9.8%, wind 8.9%, solar 3.3%. Clean power: 23.7% |
| Industrial power price | USD 0.099 per kWh (Missouri, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.8 °C (2001 to 2025) |
| Cooling degree days | 831 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.17 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Missouri) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Genome Data Center use?
We estimate the facility power at about 3.7 MW. Estimate from building footprint, low confidence.
How close is Genome Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Missouri Central Substation (138 kV), about 1.7 km away. The local utility is City Of Kirkwood, in the MISO balancing area.
How clean is the power for Genome Data Center?
The grid in Missouri emits about 674 g CO₂ per kWh (2025). Largest sources: coal 63.1%, gas 13%, nuclear 9.8%.
Who operates Genome Data Center?
Washington University in St. Louis.
Data centers near Saint Louis
- TierPoint St. Louis - Locust 3.7 km
- Cogent St Louis 4.1 km
- Netrality St. Louis - 210 N Tucker 5.1 km · 19 MW
- TierPoint St. Louis - Olive 5.2 km · 13 MW
- 710 Tucker St Louis 5.2 km
- Netrality St. Louis - 900 Walnut 5.4 km
- TierPoint St. Louis – Millpark 15.2 km
- Data center in Edwardsville 32.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.