Data Center Directory

Genome Data Center

Genome Data Center is an operational data center operated by Washington University in St. Louis in Saint Louis, United States. Our footprint estimate of its power is about 3.7 MW.

Key facts

StatusOperational
OperatorWashington University in St. Louis
Facility power3.7 MW (range 1.8 MW to 5.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,083 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSouth Newstead Avenue 222, 63110, Saint Louis
Coordinates38.63655, -90.25544

Power and grid

Nearest high-voltage substationMissouri Central Substation, 138 kV, 1.7 km away (Ameren Missouri)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationCambell Substation, 345 kV, 7.4 km away
HV substations within 10 km17
UtilityCity Of Kirkwood (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineMississippi River Trans Corp, interstate pipeline, 1.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km2.9 GW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity674 g CO₂ per kWh (Missouri, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 63.1%, gas 13%, nuclear 9.8%, wind 8.9%, solar 3.3%. Clean power: 23.7%
Industrial power priceUSD 0.099 per kWh (Missouri, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature13.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.8 °C (2001 to 2025)
Cooling degree days831 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.17 kWh per m² per day
Wind at 50 m4.9 m/s average
Water stress todayLow - Medium (10-20%) (Missouri)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Genome Data Center use?

We estimate the facility power at about 3.7 MW. Estimate from building footprint, low confidence.

How close is Genome Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is Missouri Central Substation (138 kV), about 1.7 km away. The local utility is City Of Kirkwood, in the MISO balancing area.

How clean is the power for Genome Data Center?

The grid in Missouri emits about 674 g CO₂ per kWh (2025). Largest sources: coal 63.1%, gas 13%, nuclear 9.8%.

Who operates Genome Data Center?

Washington University in St. Louis.

Data centers near Saint Louis

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.