TierPoint Boston - Andover
TierPoint Boston - Andover is an operational data center operated by TierPoint in Andover, United States. Our footprint estimate of its power is about 6.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TierPoint |
| Facility power | 6.8 MW (range 3.4 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,682 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Address | 15 Shattuck Road |
| Coordinates | 42.68569, -71.20869 |
| Website | tierpoint.com |
Power and grid
| Utility | Massachusetts Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ISNE |
| Nearest gas pipeline | Tennessee Gas Pipeline, interstate pipeline, 100 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 356 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.82 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TierPoint Boston - Andover use?
We estimate the facility power at about 6.8 MW. Estimate from building footprint, low confidence.
How clean is the power for TierPoint Boston - Andover?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates TierPoint Boston - Andover?
TierPoint.
Data centers near Andover
- Navisite Andover 1.2 km
- Markley Group Lowell 10.1 km · 17 MW
- Prov.net CHF1 (Boston North) 14.1 km
- Equinix BO2 - Boston, Billerica 14.9 km
- EdgeConneX Boston (EDCBOS01) 17.8 km
- 200 Quannapowitt Pkwy 21.0 km
- ColoSpace - Waltham, MA 32.0 km
- EXA CLS Lynn 32.3 km
More TierPoint data centers
- TierPoint St. Louis - Olive United States
- TierPoint Kansas City - Lenexa United States
- TierPoint Sioux Falls - West United States
- TIerPoint Little Rock United States
- TierPoint Baltimore United States
- TierPoint Nashville United States
- TierPoint Tulsa-Archer United States
- TierPoint Dallas2 - Allen United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.