EdgeConneX Boston (EDCBOS01)
EdgeConneX Boston (EDCBOS01) is an operational data center operated by EdgeConneX in Billerica, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Address | 22 Linnell Circle |
| Coordinates | 42.52851, -71.24949 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Pinehurst Substation, 115 kV, 2.9 km away (National Grid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Lexington Substation, 345 kV, 9.4 km away |
| HV substations within 10 km | 6 |
| Utility | Massachusetts Bay Trans Authority (political subdivision) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ISNE |
| Nearest gas pipeline | Tennessee Gas Pipeline, interstate pipeline, 5.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.1 GW in 131 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 403 g CO₂ per kWh (Massachusetts, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 65.4%, solar 24.6%, oil and other fossil 4.5%, bioenergy 3.2%, hydro 1.4%. Clean power: 30.1% |
| Industrial power price | USD 0.200 per kWh (Massachusetts, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 356 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.82 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Massachusetts) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is EdgeConneX Boston (EDCBOS01) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Pinehurst Substation (115 kV), about 2.9 km away. The local utility is Massachusetts Bay Trans Authority, in the ISNE balancing area.
How clean is the power for EdgeConneX Boston (EDCBOS01)?
The grid in Massachusetts emits about 403 g CO₂ per kWh (2025). Largest sources: gas 65.4%, solar 24.6%, oil and other fossil 4.5%.
Who operates EdgeConneX Boston (EDCBOS01)?
EdgeConneX.
Data centers near Billerica
- Equinix BO2 - Boston, Billerica 3.8 km
- Prov.net CHF1 (Boston North) 10.2 km
- Markley Group Lowell 12.2 km · 17 MW
- 200 Quannapowitt Pkwy 13.5 km
- ColoSpace - Waltham, MA 14.3 km
- Centersquare Boston (BOS1-A) 14.7 km
- Equinix BO1 - Boston, Waltham 14.9 km
- Cogent Boston 15.1 km
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.