ColoSpace - Waltham, MA
ColoSpace - Waltham, MA is an operational data center operated by FirstLight Fiber in Waltham, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | FirstLight Fiber |
| Networks | 1 networks PeeringDB. |
| Address | 265 Winter Street |
| Coordinates | 42.39988, -71.25313 |
| Website | firstlight.net |
Power and grid
| Utility | Massachusetts Bay Trans Authority (political subdivision) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ISNE |
| Nearest gas pipeline | Algonquin Gas Trans Co, interstate pipeline, 1.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 403 g CO₂ per kWh (Massachusetts, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 65.4%, solar 24.6%, oil and other fossil 4.5%, bioenergy 3.2%, hydro 1.4%. Clean power: 30.1% |
| Industrial power price | USD 0.200 per kWh (Massachusetts, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 356 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.81 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Massachusetts) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for ColoSpace - Waltham, MA?
The grid in Massachusetts emits about 403 g CO₂ per kWh (2025). Largest sources: gas 65.4%, solar 24.6%, oil and other fossil 4.5%.
Who operates ColoSpace - Waltham, MA?
FirstLight Fiber.
Data centers near Waltham
- Cogent Boston 774 m
- Centersquare Boston (BOS1-A) 1.2 km
- Equinix BO1 - Boston, Waltham 1.4 km
- Centersquare Boston (BOS4-A) 8.7 km
- LightWave Networks 11.2 km
- Digital Realty BOS14 - Boston 11.3 km
- Lumen Boston 14.1 km
- EdgeConneX Boston (EDCBOS01) 14.3 km
More FirstLight Fiber data centers
- ColoSpace - Bedford, NH United States
- ColoSpace - Rockland, MA United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.