ColoSpace - Bedford, NH
ColoSpace - Bedford, NH is an operational data center operated by FirstLight Fiber in Bedford, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | FirstLight Fiber |
| Networks | 2 networks PeeringDB. |
| Address | 8 Commerce Dr |
| Coordinates | 42.92823, -71.46393 |
| Website | firstlight.net |
Power and grid
| Utility | Liberty Utilities (Granite State Electri (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ISNE |
| Nearest gas pipeline | EnergyNorth Nat Gas Co, interstate pipeline, 4.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 180 g CO₂ per kWh (New Hampshire, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 55.3%, gas 27%, hydro 6.9%, bioenergy 4.1%, wind 2.4%. Clean power: 70.7% |
| Industrial power price | USD 0.173 per kWh (New Hampshire, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.9 °C (2001 to 2025) |
| Cooling degree days | 297 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.71 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Low - Medium (10-20%) (New Hampshire) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for ColoSpace - Bedford, NH?
The grid in New Hampshire emits about 180 g CO₂ per kWh (2025). Largest sources: nuclear 55.3%, gas 27%, hydro 6.9%.
Who operates ColoSpace - Bedford, NH?
FirstLight Fiber.
Data centers near Bedford
- ColoCenter.com - Manchester NH 4.9 km
- Crown Castle Manchester (1 Sundial Ave) 5.0 km
- Consolidated - 770 Elm St. 6.8 km
- Navisite Andover 33.0 km
- TierPoint Boston - Andover 34.1 km · 6.8 MW
- Markley Group Lowell 35.6 km · 17 MW
- Prov.net CHF1 (Boston North) 38.4 km
- Information Technology Data Center 42.2 km · 1.4 MW
More FirstLight Fiber data centers
- ColoSpace - Rockland, MA United States
- ColoSpace - Waltham, MA United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.