Information Technology Data Center
Information Technology Data Center is an operational data center operated by Phillips Exeter Academy in Exeter, United States. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Phillips Exeter Academy |
| Facility power | 1.4 MW (range 0.7 MW to 2.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,173 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 42.98209, -70.95059 |
Power and grid
| Utility | Unitil Energy Systems (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ISNE |
| Nearest gas pipeline | Granite State Gas Trans Co, interstate pipeline, 1.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 180 g CO₂ per kWh (New Hampshire, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 55.3%, gas 27%, hydro 6.9%, bioenergy 4.1%, wind 2.4%. Clean power: 70.7% |
| Industrial power price | USD 0.173 per kWh (New Hampshire, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (New Hampshire) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Information Technology Data Center use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How clean is the power for Information Technology Data Center?
The grid in New Hampshire emits about 180 g CO₂ per kWh (2025). Largest sources: nuclear 55.3%, gas 27%, hydro 6.9%.
Who operates Information Technology Data Center?
Phillips Exeter Academy.
Data centers near Exeter
- FirstLight data center in Portsmouth 15.6 km · 1.8 MW
- University of New Hampshire data center in Durham 18.0 km · 4.2 MW
- Navisite Andover 38.2 km
- TierPoint Boston - Andover 39.1 km · 6.8 MW
- Consolidated - 770 Elm St. 41.7 km
- ColoCenter.com - Manchester NH 42.2 km
- ColoSpace - Bedford, NH 42.2 km
- Crown Castle Manchester (1 Sundial Ave) 42.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.