ColoSpace - Rockland, MA
ColoSpace - Rockland, MA is an operational data center operated by FirstLight Fiber in Rockland, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | FirstLight Fiber |
| Networks | 1 networks PeeringDB. |
| Address | 1050 Hingham Street |
| Coordinates | 42.16626, -70.89835 |
| Website | firstlight.net |
Power and grid
| Utility | Massachusetts Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ISNE |
| Nearest gas pipeline | Algonquin Gas Trans Co, interstate pipeline, 7.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 403 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.82 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for ColoSpace - Rockland, MA?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates ColoSpace - Rockland, MA?
FirstLight Fiber.
Data centers near Rockland
- 230 Congress 24.5 km
- Markley Group One Summer Street Boston 24.8 km
- Lumen Boston 27.2 km
- Hub Express System 27.7 km
- CoreSite - Boston (BO1) 27.8 km · 12 MW
- Evocative BOS1 27.9 km
- Expedient Boston 30.3 km
- Digital Realty BOS14 - Boston 30.4 km
More FirstLight Fiber data centers
- ColoSpace - Bedford, NH United States
- ColoSpace - Waltham, MA United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.